This office space required new flooring due to the old laminate tiles peeling and chipping, along with over 20 years of stubborn grime buildup. After removing the tiles, we diamond-ground the tile adhesive and prepped the concrete. We then applied a slate gray epoxy with Nightfall 1/8″ flakes, finished with a polyaspartic top coat and a 30-grit Rhino Tooth non-skid additive to enhance employee safety.